The homeowners knew their older mansard roof had been repaired in stages over the years, but they were not dealing with an active leak or emergency.
They wanted a clear picture of what actually needed attention now, what could wait, and how to plan the work before the roof forced the decision for them.
The homeowners had owned the house for many years and knew different roof sections had been repaired or replaced at different times. Because there were no active leaks, the question was not “How do we stop an emergency?” It was “What really needs to be done, and how should we plan for it?”
That made the inspection especially important. Instead of reacting to one failure, the goal was to separate the areas that were approaching the end of their useful life from sections that might still have some serviceable time remaining.
The clearest concern was the shingle and mansard roof system. Multiple shingles were loose, slipped, or blown out of position, especially on the steep mansard faces. Additional moss and age-related wear were visible across the main shingle areas.
Those conditions pointed to a roof system that was no longer staying consistently secured. On a mansard roof, isolated patching can become difficult when movement is occurring across multiple sections rather than at one small defect.
The flat-roof sections showed aging surface wear, prior patching, and older edge or flashing details, but the inspection did not identify an active leak at the time. That distinction mattered because the homeowners were trying to plan the work responsibly rather than automatically replace every surface at once.
The contracted project ultimately included full removal of the existing flat roofing system and installation of a new fully adhered EPDM roof assembly on the included flat sections, but the inspection itself helped separate the urgency of the failing mansard/shingle areas from the condition of the low-slope sections.
Several fascia and decorative trim areas showed peeling paint, exposed wood, deterioration, and detached sections. These details sit directly at roof edges, so deterioration can affect more than appearance when water repeatedly reaches vulnerable wood.
The final scope included removal and replacement of approximately 155-156 linear feet of designated fascia with new PVC fascia boards, creating a more durable finished edge around the repaired roof system.
The project scope combined the work that made sense to complete together: a full shingle and mansard reroof, included flat-roof replacement with a fully adhered 0.060 EPDM system over insulation, new flashing and penetration details, and designated fascia replacement.
Remove the existing shingle and mansard roofing down to the roof deck and install a new architectural asphalt shingle system.
Install ice and water protection at critical areas, synthetic underlayment, new drip edge, step flashing, and chimney counterflashing as required.
Remove the included flat roofing down to the structural deck and install insulation with a fully adhered 0.060 EPDM membrane.
Complete new seam, penetration, edge, and termination detailing throughout the low-slope roof system.
Replace approximately 155-156 linear feet of designated fascia with new PVC fascia boards.

Replaces loose and slipping shingles with a complete integrated roofing system instead of continuing isolated patching.
Removes aged roof-cement repairs and rebuilds chimney, wall, and penetration details as part of the new roof.
Replaces included aging flat-roof areas with a fully adhered EPDM system designed for low-slope conditions.
Replaces deteriorated designated fascia with PVC to create a cleaner, more durable roof edge.
Not always. A roof can sometimes continue performing without an active leak even when aging or installation problems are developing. An inspection can help determine whether targeted repairs are still reasonable or whether widespread wear, loose materials, and failing details make planned replacement the better long-term option.
Mansard roofs have steep, highly visible roof faces and often include more transitions, trim, and detailing than a simple gable roof. Proper fastening, flashing, and edge work are especially important, and widespread shingle movement can make repeated spot repairs less practical over time.
Yes. Homes with mixed roof types can be completed as one coordinated project using the roofing system appropriate for each area. In this project, the steep shingle and mansard sections were paired with a fully adhered EPDM system on the included low-slope roof areas.
Once the old roofing is removed, the exposed deck is inspected. If damaged, rotted, or otherwise compromised decking is discovered, the condition is documented and any additional replacement work is addressed through the project’s change-order process.
Yes. Peak Quality Roofing provides roof inspections, repairs, and full roof replacement services in Lynn and surrounding Greater Boston communities, including projects with shingle, mansard, and low-slope roofing systems.
CUSTOMER CARE
OFFICE LOCATION
58 Mount Vernon Ave, Melrose, MA 02176
FOLLOW US ON
Copyright 2025. All rights reserved.
Website by Pure Value Advisors
OUR SERVICES
Gutter
Skylight
Snow & Ice Removal
SERVICE LOCATIONS
OFFICE LOCATION
58 Mount Vernon Ave, Melrose, MA 02176